Town And Country Engineering


Large Firm Expertise. Small Firm Value.
Town and country HomeContact Town And Country Engineering
Customer Testimonials
Projects

Municipal Engineering

Village of Cross Plains - Mill Creek Parkway 

This innovative project involved constructing a new street adjacent to Black Earth Creek, which is recognized as a premier trout fishing destination and a regionally significant and unique resource.  Stormwater management was of paramount concern.  Town & Country Engineering incorporated innovative stormwater management techniques, including bioretention, permeable asphalt pavement parking area and porous concrete sidewalk into the street design.  Close coordination with the Wisconsin Department of Natural Resources and the Village of Cross Plains staff made this project highly successful.  

 

City of Rhinelander - Downtown Reconstruction

This $10,000,000 project involved complete reconstruction of twelve blocks of downtown Rhinelander, including complete sanitary sewer, water main, storm sewer and street reconstruction.  Existing sidewalks were removed and replaced with new streetscaping, and a completely new streetlighting system was installed.  Town & Country Engineering obtained a Rural Development Agency grant and loan package for the City.  Additional financial assistance was obtained from the Department of Natural Resources Clean Water Fund and Safe Drinking Water Fund programs.  Coordination with downtown businesses was essential.  Removal of old coal chutes and coal rooms under the sidewalk was achieved by inventorying these below-grade features using ground penetrating radar and with a building inspection program.  Building roof drains were disconnected from the sanitary sewer system and reconnected to the storm sewer system.


Village of Blue Mounds - Commercial and Industrial Parks

This project consisted of new construction of an 18-acre commercial park and a 40-acre industrial park financed by the Village with Tax Incremental Financing District funds. In the commercial park work included construction of new streets with curb & gutter and extension of sanitary sewer and water utilities to the site.  Construction of a new sewage pumping station was necessary. Stormwater management features including thermal control for sensitive downstream waters, total suspended solids and rate control using dry detention ponds, and runoff quantity control using stone infiltration beds. 


City of Jefferson - Washington Street and Sanborn Street Reconstruction

This project involved construction of new storm sewer of several blocks of Washington and Sanborn Streets to eliminate flooding caused by an undersized storm sewer system.  Existing sanitary sewers and water mains were also replaced, and streets and sidewalks were reconstructed. Close coordination with area schools and churches was essential to the success of the project.


Village of Cambridge - Camrock Bicycle Trail Extension

This project involved extension of a bicycle trail through the Village to connect to a County bicycle trail.  New sections of asphalt trail were created through a Village park, and existing streets were re-marked to allow shared use by bicycles and motor vehicles.  One U.S. highway and one State of Wisconsin highway were crossed by installation of RRFBs (Rectangular Rapid Flashing Beacons).  Permitting through the State Department of Transportation was required.  A Dane County PARC grant assisted in financing the cost.

 

 

 Copyright © . Town & Country Engineering, Inc., All Rights Reserved.

Web Presence by NETPHORIA
2912 Marketplace Drive
Suite 103
Madison, WI 53719
(608) 273-3350
Email Us
       Rhinelander Office
150 South Anderson St.
Suite 3
Rhinelander, WI 54501
(715) 420-0579
Kenosha Office
10505 Corporate Drive
Suite 105A
Pleasant Prairie, WI 53158